Wholesale Expansion Loop - U-FLEX – Ehase-Flex
Wholesale Expansion Loop - U-FLEX – Ehase-Flex Detail:
Product Description
Model:EHUT /EHUG /EHUF U-Flex
EHUT Threaded Type
Construction:
Item |
Parts |
Material |
Remark |
1 |
Threads |
Carbon Steel |
SUS304/316/321 PT/NPT. |
2 |
90° Elbow |
Carbon Steel |
SUS304/316/321 |
3 |
Seal Ring |
SUS304 |
SUS316/321 |
4 |
Bellows |
SUS304 |
SUS316/321 |
5 |
Braids |
SUS304 |
|
6 |
180° Elbow |
Carbon Steel |
SUS304/316/321 |
7 |
Weep Hole |
Carbon Steel |
SUS304/316/321 |
8 |
Fixing Holder |
Carbon Steel |
SUS304/316/321 |
Specification:
Norminal Bore |
L |
W |
Movement |
Working Pressure |
|
ins |
mm |
(mm) |
(mm) |
(mm) |
(psi) |
1/2 |
15 |
350 |
250 |
150 |
200 |
3/4 |
20 |
380 |
260 |
150 |
200 |
1 |
25 |
380 |
260 |
150 |
200 |
1 1/4 |
32 |
420 |
300 |
150 |
200 |
1 1/2 |
40 |
480 |
350 |
150 |
200 |
2 |
50 |
600 |
420 |
150 |
200 |
The size, pressure and movement tabulated above are standard. We can design and manufacture as required.
EHUG Grooved Type
Construction:
Item |
Parts |
Material |
Remark |
1 |
Grooved Tube End |
Carbon Steel |
SUS304/316/321 |
2 |
90° Elbow |
Carbon Steel |
SUS304/316/321 |
3 |
Seal Ring |
SUS304 |
SUS316/321 |
4 |
Bellows |
SUS304 |
SUS316/321 |
5 |
Braids |
SUS304 |
|
6 |
180° Elbow |
Carbon Steel |
SUS304/316/321 |
7 |
Weep Hole |
Carbon Steel |
SUS304/316/321 |
8 |
Fixing Holder |
Carbon Steel |
SUS304/316/321 |
Specification
Norminal Bore |
L |
W |
Movement |
Working Pressure |
|
ins |
mm |
(mm) |
(mm) |
(mm) |
(psi) |
2 |
50 |
600 |
420 |
150 |
200 |
2 1/2 |
65 |
700 |
540 |
150 |
200 |
3 |
80 |
750 |
600 |
150 |
200 |
4 |
100 |
875 |
750 |
150 |
200 |
5 |
125 |
1000 |
900 |
150 |
200 |
6 |
150 |
1150 |
1050 |
10 |
200 |
8 |
200 |
1400 |
1100 |
150 |
200 |
10 |
250 |
1545 |
1300 |
150 |
200 |
12 |
300 |
1720 |
1520 |
150 |
200 |
The size, pressure and movement tabulated above are standard. We can design and manufacture as required.
EHUF Flanged Type
Construction:
Item |
Parts |
Material |
Remark |
1 |
Flange |
Carbon Steel |
SUS304/316/321 |
2 |
Tube |
Carbon Steel |
SUS304/316/322 |
3 |
90° Elbow |
Carbon Steel |
SUS304/316/321 |
4 |
Seal Ring |
SUS304 |
SUS316/321 |
5 |
Bellows |
SUS304 |
SUS316/321 |
6 |
Braids |
SUS304 |
|
7 |
180° Elbow |
Carbon Steel |
SUS304/316/321 |
8 |
Weep Hole |
Carbon Steel |
SUS304/316/321 |
9 |
Fixing Holder |
Carbon Steel |
SUS304/316/321 |
Specification:
Norminal Bore |
L |
W |
Movement |
Working Pressure |
|
ins |
mm |
(mm) |
(mm) |
(mm) |
(psi) |
2 |
50 |
600 |
400 |
150 |
200 |
2 1/2 |
65 |
700 |
500 |
150 |
200 |
3 |
80 |
750 |
570 |
150 |
200 |
4 |
100 |
875 |
720 |
150 |
200 |
5 |
125 |
1000 |
900 |
150 |
200 |
6 |
150 |
1150 |
1050 |
150 |
200 |
8 |
200 |
1450 |
1100 |
150 |
200 |
10 |
250 |
1800 |
1200 |
150 |
200 |
12 |
300 |
2200 |
1400 |
150 |
200 |
The size, pressure and movement tabulated above are standard. We can design and manufacture as required.
Flanges: JIS, ANSI, DIN, BS, JB. Etc.
Details:
1.Excellent Welding Technology,like a fish swimming in water.
2.Omage Bellows,More flexible and longer service life.
3.100 % Tested Before Delivery.
Products
Certificate
Company Information
Supply Ability: 100000 Pieces per Year.
Shipping & Delivery
Packaging Details:Carton Box, Pallet or Plywood Case; As Customer’s Requirement.
No Unacceptable Packaging Material or Bamboo Products Been Used as Packing.
Lead Time : Depends on QTY; Normally 20days or As Client’s Requirement.
Port: shanghai or ningbo or Any Port in China.
HS Code:8307100000
Product detail pictures:
Related Product Guide:
We always work as a tangible team to ensure that we can provide you with the best quality and the best price for Wholesale Expansion Loop - U-FLEX – Ehase-Flex , The product will supply to all over the world, such as: British, Israel, Argentina, Taking the core concept of "to be the Responsible". We'll redound up on society for high quality merchandise and good service. We will initiative to participate in international competition to be a first- class manufacturer of this product in the world.
By Judith from Ukraine - 2018.02.12 14:52
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
By Daphne from Austria - 2017.12.19 11:10